Asbestos
Subcontractors
Prior to Mobilization
–
–
–
–
–
–
–
Asbestos Training Certificates
Respirator Training
Fit Test Records
Asbestos Abatement Plan
Notification to BAAQMD
SQF of Sub-Tiers
Abatement Work Included in SSSP
Once On Site
• Develop JSA & Pre-task ( a well written Asbestos Abatement
Plan can be used as contractor SSSP/JSA)
• Coordinate with Building Manager
• Coordinate with FCM for Utility Shutdown
• Must LO/TO with SLAC
4
Get to Work
•
•
•
•
•
Cordon Off Work Area
Post Signage
Establish Critical Barriers
Set Up Containment
SLAC Industrial Hygienist Conducts
Inspection Prior to Abatement
• Released to Perform Abatement
Containment
[Negative air/HEPA filter]
A SLAC IH must conduct a clearance inspection
prior to taking down an enclosure
SLAC Oversight
•
•
•
•
Provide Viewing Windows
General Contractor Manages Work
SLAC Performs Daily Job Walks
DOE Will Also Perform Job Walks
SLAC WM Handles all asbestos waste
1.
All waste must be bagged or burrito wrapped.
2.
The waste must be wetted
3.
The waste bag should be filled to about 50% of its capacity
4.
Wipe off tools
5.
Everything goes in the waste bag
6.
The waste bag must be closed with a gooseneck with duct tape
7.
Ensure right waste in right container - Friable or Non-friable
8.
Contact WM at ext #2399 to request containers
Waste Management